Artigiana Costruzioni is a company which operates in the field of soil defence systems since mid-80s, through the design and manufacture of innovative, reliable and fitting systems. After their installation, however, unexpected natural events – such as rock slides, tree falls, scree falls, snow drifts etc. – may curtail or even counteract their capability. For each structure a design “maximum life period” is calculated, which is defined at “the time lapse beyond which the said structure does no longer guarantee the efficiency standard for which it was designed”. Thus, to preserve in time the defence structures, it is necessary to follow up with a management plan in order to effectlively monitor their condition and to intervene, if necessary, to restore the barrier to their working order.Artigiana Costruzioni’s design department, thanks to its valuable experience gained through many years of operating in the field of soil protection, has drawn up a management plan called “Inspection, Monitoring and Maintenance Plan”. The Plan is to assess the working order, the condition of the work and to draw up suitable intervention schedules. The Inspection, Monitoring and Maintenance Plan comprises three different stages:
STAGE 1: Inspection and monitoring This is an investigation and fact-finding exercise on the existing condition, which will be crucial to the subsequent drafting of the most suitable remedial actions on the structures. The “Inspection and monitoring” stage mainly comprises the following:
STAGE 2: Planning of remedial action This is the assessment and planning stage of maintenance interventions in order to restore full working working condition to the barrier. This stage mainly comprises the following:
STAGE 3: Structual restoration and maintenance interventions The actual interventions determined and planned for in the ‘Planning of remedial action” stage. This stage mainly comprises:
|